FVSCHEDULE function
Returns the future value of an initial principal after applying a series of compound interest rates
Syntax
FVSCHEDULE(principal, schedule)Square brackets indicate optional arguments.
Arguments
| Argument | Required | Meaning |
|---|---|---|
| principal | Yes | The present value.1 |
| schedule | Yes | An array of interest rates to apply.A1:A4 |
Try FVSCHEDULE
Compound three different period rates
=FVSCHEDULE(B2,A2:A4)Multiply 1000 by 1.10, then 0.95, then 1.02. The result 1065.9 includes a negative middle-period return; adding the rates would give a different answer.
Inspect the current formula
Read its written arguments or observe actual operation values in a separate local calculation. This action neither applies a draft nor grades an answer.
Read the formula, one argument at a time
Explore the written function calls and their inputs. The calculation result belongs to the complete formula.
FVSCHEDULE · top-level call
=FVSCHEDULE(B2,A2:A4)Follow the cells behind a result
Read explicit local references and helper formulas using a separate calculation. Your draft stays in this field; the worksheet and practice checks do not change.
The worksheet runs locally. Published checks apply to the supplied example only. Native Excel and Google Sheets compatibility remain unverified.
Reference and compatibility
Univer 1.0.4 / Apache-2.0. Calculation checks cover the supplied examples only. The browser worksheet does not implement every Excel feature, external service or connected data type.